Liaison with Powercor for new pole mounted transformer connection;
Supply and Installation of LV Pillar in the external plant and LV back connected Main switchboard in the main building;
Provide power and lighting for the carpark and driveways from existing electrical pillar near Corio Library as they reside on a separate title (City of Geelong).
Supply and installation of a packaged diesel generator unit;
Central uninterruptible power supply (UPS) is NOT provided in this project. Provide rack, mounted UPS units in the Communications racks.
Supply and installation of Distribution Boards (DB’s);
Supply and installation of all consumer mains and Submains cabling and associated cable support systems;
Identify and test existing ‘Create’ building submains from existing electrical pillar near Corio Library. Note ‘Create’ building will be demolished as part of the project.
Earthing systems;
Lighting;
Lighting Control systems;
Emergency escape lighting and exit signs;
Power including supplies to equipment by others;
Miscellaneous equipment;
Communications structured cabling system;
Converged cabling and network (passive cabling only) CCTV system;
Access control system;
Intruder alarm system
Intercom system;
Master clock is not provided in this project;
Electric clock
Nurse call system;
Provisions and interface for building management system (BMS);
Interfacing with AV systems specified elsewhere;
Interfacing with Barwon Main Hospital via IT networks;
Free to air MATV is part Nurse Call Solar PV system
Provision of in ground conduits and pit systems, as documented on the drawings, including all trenching, backfill, compaction and reinstatement of surfaces;
Provision of cable trays as documented on the drawings. For fire rated cables, allow to supply and install fire protected cable tray in accordance AS3013 to meet the same level of protection as the fire rated cable for the full length.